jeddah · guide · processed · 942 chunks
T Kingdom Of Saudi Arabia Ministry of municipal & Rural Affairs Deputy Ministry for Technical Affairs MOMRA Bridges, Tunnels, Culverts and Pedestrian Bridges Specifications in Urban Areas Construction Specifications MA 100-C-V1/1 2013 T Kingdom Of Saudi Arabia Ministry of municipal & Rural Affairs Deputy Ministry for Technical Affairs Introduction As for the importance and vitality of road constructions and the need to control them so as to perform their function in an appropriate way throughout their service age. So many countries and Organizations had prepared specifications for design and construction these structures. These Specifications were differed from one another according to the environment and the nature of the climate. For instance some organizations and societies in U.S.A. Such as the American Association of State Highway and Transportation Officials (AASHTO). These organizations and societies have improved and updated design specification. In the same way each state in U.S.A. has developed its own specification mainly based on AASHTO specification and refers to them In different situations, but they will be suitable for the circumstances of the State that has improved them. As for K.S.A. which is one of the countries that has a large transportation network and many road structures, so the necessity arose to prepare suitable specification for these structures to suit the environmental circumstances and the transportation policy that has adopted in K.S.A. So the Kingdom of Saudi Arabia representative in the Ministry of Municipal and Rural Affairs has taken the role of collecting the specification under the title Bridges, Tunnels, culverts, pedestrian bridges in the urban areas. These specifications include the following: 1- Preliminary studies 2-Design specifications 3-Construction specifications The ministry has also updated codes for both bridges and culverts manuals according to the new specifications. T Kingdom Of Saudi Arabia Ministry of municipal & Rural Affairs Deputy Ministry for Technical Affairs Specifications Books <table><tr><td>1</td><td>Preliminary studies</td><td>MA 100-P-V1/1</td></tr><tr><td>2</td><td>Construction Specifications</td><td>MA 100-C-V1/1</td></tr><tr><td>3</td><td>Design specifications</td><td>MA 100- D- V1/2</td></tr><tr><td>4</td><td>Design specifications</td><td>MA 100-D- V2/2</td></tr></table> MOMRA Bridges Construction Specifications TABLE OF CONTENTS TABLE OF CONTENTS......I SECTION 1. ABBREVIATIONS AND DEFINITION OF TERMS...... 1 1.1. GENERAL....1 1.2. ABBREVIATIONS....1 1.3. TERMS 2 1.3.1. Acceptance Plan....2 1.3.2. Acceptable Quality Level AQL 2 1.3.3. Acceptance Program 2 1.3.4. Additive....2 1.3.5. Addendum....2 1.3.6. Advertisement for Bids or Notice to Contractors 2 1.3.7. Article 2 1.3.8. Award....2 1.3.9. Backfill....3 1.3.10. Back Slope 3 1.3.11. Bid....3 1.3.12. Bidder....3 1.3.13. Binder Layer 3 1.3.14. Bill of Quantities....3 1.3.15. Bridge....3 1.3.16. Bridge Length 3 1.3.17. Bridge Roadway Width....3 1.3.18. Boulder....3 1.3.19. Calendar Day 3 1.3.20. Calibrate....3 1.3.21. Camber....4 1.3.22. Centerline 4 1.3.23. Certificate of Guarantee 4 1.3.24. Compaction....4 1.3.25. Construction Joint 4 1.3.26. Consecutive Days....4 1.3.27. Contract and Contract Documents 4 1.3.28. Contract Bid Price....4 1.3.29. Contract Bonds....4 1.3.30. Contract Item (Item of Work) 4 1.3.31. Contract Time 5 1.3.32. Contractor 5 1.3.33. Contract Payment Bond 5 1.3.34. Contract Performance Bond....5 1.3.35. Contract Sum or Contract Amount 5 1.3.36. Country 5 1.3.37. Culvert....5 1.3.38. Date 5 i Bridges Construction Specifications MOMRA 1.3.39. Deck 5 1.3.40. Density 5 1.3.41. Design Mix 5 1.3.42. Design Load 5 1.3.43. Detour....6 1.3.44. Directive 6 1.3.45. Dowel 6 1.3.46. Drawings 6 1.3.47. Elevation....6 1.3.48. Engineer 6 1.3.49. Equipment 6 1.3.50. Existing....6 1.3.51. Expansion Joint 6 1.3.52. Extra Work 6 1.3.53. Extra Work Order....6 1.3.54. Faulting....6 1.3.55. Force Account Work 7 1.3.56. General Specifications....7 1.3.57. Grout....7 1.3.58. Guarantor....7 1.3.59. Holiday 7 1.3.60. Headwall....7 1.3.61. Inspector 7 1.3.62. Item of Work 7 1.3.63. Job-Mix job-mix formula, design-mix 7 1.3.64. Joint 7 1.3.65. Kingdom....7 1.3.66. Laboratory 7 1.3.67. Legal Holidays 7 1.3.68. Leveling Course 8 1.3.69. Load Transfer Device 8 1.3.70. Longitudinal Joint 8 1.3.71. Lot 8 1.3.72. Major Item 8 1.3.73. Materials 8 1.3.74. Ministry 8 1.3.75. Municipality Amanah....8 1.3.76. Municipality of province Baladiah 8 1.3.77. Minor Concrete 8 1.3.78. Moisture Content....8 1.3.79. Original Ground 8 1.3.80. Performance Guarantee 8 1.3.81. Period of Maintenance....9 1.3.82. Plans 9 1.3.83. Price Breakdown 9 1.3.84. Preconstruction Conference 9 1.3.85. Program of Work....9 1.3.86. Process-Verbal 9 1.3.87. Professional Engineer....9 1.3.88. Provisional Handover....9 1.3.89. Proposal....9 1.3.90. Proposal Form 9 1.3.91. Quality Assurance 10 1.3.92. Quality Assurance Procedures.... 10 1.3.93. Quality Control.... 10 ii MOMRA Bridges Construction Specifications 1.3.94. Quality Index 10 1.3.95. Questionnaire 10 1.3.96. Random....10 1.3.97. Rural council....10 1.3.98. Rejectable Quality Level RQL....10 1.3.99. Reinforcement....10 1.3.100. Reprocessing....10 1.3.101. Resurfacing 10 1.3.102. Right-of-Way 11 1.3.103. Riprap....11 1.3.104. SABKHA 11 1.3.105. Shop Drawings....11 1.3.106. Sidewalk....11 1.3.107. Site 11 1.3.108. Site Engineer....11 1.3.109. Skew Angle....11 1.3.110. Specifications....11 1.3.111. Special Specifications .... 11 1.3.112. Specified Completion Date .... 11 1.3.113. Standard Drawings....11 1.3.114. Standard Specifications....12 1.3.115. Subcontractor 12 1.3.116. Substructure 12 1.3.117. Superintendent 12 1.3.118. Superstructure 12 1.3.119. Superelevation....12 1.3.120. Supplemental Agreement....12 1.3.121. Supplemental Specification....12 1.3.122. Surety 12 1.3.123. Temporary Structure 12 1.3.124. Tender 12 1.3.125. Tender Documents....12 1.3.126. Tender Guarantee....13 1.3.127. Tenderer 13 1.3.128. Traffic Lane 13 1.3.129. Visual Inspection 13 1.3.130. Water-Cement Ratio 13 1.3.131. Weephole 13 1.3.132. Work 13 1.3.133. Working Day....13 1.3.134. Working Drawings....13 1.4. REFERENCES....14 SECTION 2. INSTRUCTIONS TO BIDDERS....15 2.1. PROPOSAL REQUIREMENTS AND CONDITIONS....15 2.1.1. Notice to Contractors Advertisement....15 2.1.2. Language of bid 15 2.1.3. Competition documents .... 15 2.1.3.1. Competition documents include .... 15 2.2. CONTRACT RATES ....16 iii Bridges Construction Specifications MOMRA 2.2.1. PRELIMINARY GUARANTEE 16 2.2.2. Final Guarantee 16 2.3. INTERPRETATION OF QUANTITIES IN BID SCHEDULE.... 17 2.4. EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK.... 17 2.5. PREPARATION OF PROPOSAL 17 2.5.1. Proposal Form 17 2.5.2. Signing 17 2.6. WITHDRAWAL OR REVISION OF PROPOSALS 18 2.7. PUBLIC OPENING OF PROPOSALS.... 18 2.8. MATERIAL GUARANTEE.... 18 2.9. BID SUBMISSION MANNER.... 18 2.10. REFERENCES 20 SECTION 3. GENERAL RULES ...... 21 3.1. INTRODUCTION.... 21 3.2. WORK SCOPE AND DOCUMENTS.... 21 3.2.1. Contract Purpose 21 3.2.2. Contract Documents 21 3.2.3. Contract Language 22 3.2.4. Additional Drawings 22 3.2.5. Special Work 22 3.2.6. Non-Estimated Items 23 3.2.7. Addition, Omission, and Modification in Work Items.... 23 3.2.8. Introduction of New Items to the Project 23 3.2.9. Modification Claims and Disputes 24 3.2.10. Removal and Disposal of Structures and Obstructions 24 3.2.11. Power & Water Supply.... 24 3.2.12. Coordination between Works.... 24 3.2.13. Site Evacuation and Cleaning After Work Completion 24 3.2.14. Construction & Execution Record Books 25 3.2.15. Workshop Drawings.... 25 3.3. LEGAL RELATIONS AND RESPONSIBILITY TOWARDS THE PUBLIC...... 25 3.3.1. Law Abidance 25 3.3.2. Authorizations, Licenses, and Charges 25 3.3.3. Patent Right and Ownership.... 25 3.3.4. Royalties.... 26 3.3.5. Relations between Contractor and His Employees and Employees of His Subcontractor.... 26 3.3.6. Insurance 26 3.3.7. Monuments and Fossils.... 26 3.3.8. Alcoholic Drinks, Drugs, Weapons, Ammunition, and Keeping Order.... 26 3.3.9. Property Preservation 26 3.3.10. Contractor's Responsibility for Work.... 27 3.3.11. Personal Responsibility of Government Officials 27 3.3.12. Preservation of Environment.... 27 iv MOMRA Bridges Construction Specifications 3.3.13. Dangerous Wastes....28 3.3.14. Using Explosives 28 3.3.15. Losses on Persons and Properties 28 3.3.16. Traffic Control at Work Site 28 3.3.17. Safety Precautions at Project Site 29 3.3.18. Guiding and Lighting....29 3.4. SUPERVISION ON THE WORKS....29 3.4.1. Supervision Staff....29 3.4.2. Supervision Staff Duties 29 3.4.3. Supervision Staff Authorities....30 3.4.4. Supervision Staff Facilities 30 3.4.5. Laboratory, Measuring and Testing Systems and Equipments....31 3.4.5.1. Measuring Equipments 31 3.4.5.2. Sampling, Samples Storing and Testing Systems and Equipments 31 3.4.6. Client Commitments 31 3.5. EXECUTION CONDITIONS AND WORK PROGRESS: 31 3.5.1. Work Site Inspection....31 3.5.2. Work Site Handing in 31 3.5.3. Contractor Commitments....32 3.5.4. Work Site Planning 32 3.5.5. Compliance With drawings and Specifications 32 3.5.6. Coordination with Public Utilities & Structures Authorities 32 3.5.7. Signs....33 3.5.8. Contractor's Technical Staff....33 3.5.9. Penalty for Absence of Contractor Technical Staff 33 3.5.10. Work Program and Time Schedule 33 3.5.11. Construction Equipments....34 3.5.12. Pre-Construction Meeting 34 3.5.13. Subcontracts....34 3.5.14. Night Work 34 3.5.15. Unusual Traffic 35 3.5.16. Temporary Work Halting....35 3.5.17. Defects and Failure 35 3.5.18. Work Withdrawal....36 3.5.19. Assigning Withdrawn Works to another Contractor....36 3.5.20. Contract Period 36 3.5.21. Delay Penalty 37 3.5.22. As-Built Drawings: 37 3.5.23. Ending Contractor's Responsibility: 38 3.6. CONTROL AND ACCEPTANCE OF MATERIALS AND WORKS ....38 3.6.1. Materials and Works Control Procedures 38 3.6.2. Material Sources 39 3.6.3. Material Transportation and Storing 39 3.6.4. Work Inspection before Covering....39 3.7. MEASURMENT AND PAYMENT....40 3.7.1. Work Measuring 40 3.7.2. Payment Scope 40 3.7.3. Compensation for Modified Quantities....40 3.7.4. Additional Work and Work According to Calculating Manpower 41 3.7.5. Unauthorized Work....41 3.7.6. Lump Sum....41 3.7.7. Fixtures and Accessories....41 3.7.8. Payments 41 v Bridges Construction Specifications MOMRA 3.7.8.1. Current Payment.... 41 3.7.8.2. Final Payment.... 42 3.8. WORK HANDING OVER 42 3.8.1. Preliminary Handing Over 42 3.8.2. Final Handing Over 43 3.9. REFERENCES 44 SECTION 4. STRUCTURAL EXCAVATION AND BACKFILL......45 4.1. DESCRIPTION 45 4.1.1. General 45 4.1.2. Classification....45 4.1.2.1. Unclassified Excavation....45 4.1.2.2. Unclassified Structural Excavation 46 4.1.2.3. Common Substructural Excavation....46 4.1.2.4. Substructural Rock Excavation 46 4.1.2.5. Unclassified Backfill, Select Backfill, and Granular Backfill.... 46 4.1.2.6. Controlled Low-Strength Material (CLSM) Backfill.... 46 4.2. WORKING DRAWINGS 46 4.3. EXCAVATION.... 47 4.3.1. Inspection 47 4.3.1.1. General 47 4.3.1.2. Approval....47 4.3.1.3. Change in Foundation Elevations 47 4.3.1.4. Drilling or Probing 47 4.3.2. Depth and Size of Excavation 48 4.3.3. Foundation Preparation and Control of Water 48 4.3.3.1. General 48 4.3.3.2. Excavation within Channels....48 4.3.4. Foundations on Rock....49 4.3.5. Foundations not on Rock....49 4.3.6. Pile Excavation....50 4.3.7. Tunnel Excavation....50 4.3.8. Approval....50 4.3.9. Permits and Licenses....50 4.4. BACKFILLING....51 4.4.1. General 51 4.4.2. Materials....52 4.4.2.1. Controlled Low-Strength Material (CLSM)....52 1. General....52 2. Mix Design 52 3. Sampling and Testing 53 a. Flow Test 53 b. Unit weight 53 c. Strength Test 53 4.4.3. Foundation Preparation 53 4.4.4. Preservation of Stream Banks and Channel 53 4.4.5. Disposal of Surplus and Unsuitable Material 54 4.5. WORKS ACCEPTANCE:.... 54 vi MOMRA Bridges Construction Specifications 4.5.1. Quality Control: 54 4.5.1.1. Cut....54 4.5.1.2. Backfill....54 4.5.2. Quality Assurance: 55 4.5.2.1. Cut....55 4.5.2.2. Backfill....55 4.6. MEASUREMENT AND PAYMENT....55 4.6.1. Measurement....55 4.6.1.1. General....55 4.6.1.2. Excavation for Substructures Supported by Piles 55 4.6.1.3. Excavation for Substructures Supported on Natural Foundation Materials....55 4.6.1.4. Excavation for Box and Pipe Culverts....56 1. Box Culverts....56 2. Pipe Culverts 56 4.6.1.5. Excavation for Tunnels....56 4.6.1.6. Excavation for Bracing 56 4.6.1.7. Backfilling 56 4.6.1.8. Special Conditions 56 4.6.2. Payment....56 4.7. REFERENCES....59 SECTION 5. REMOVAL OF EXISTING STRUCTURES......61 5.1. DESCRIPTION....61 5.2. WORKING DRAWINGS....61 5.3. CONSTRUCTION....61 5.3.1. General....61 5.3.2. Partial Removal of Structures 62 5.3.3. Demolition 62 5.3.4. Removal of Bridges, Culverts and other Existing Structures 62 5.3.5. Removal of Sewer Pipe....63 5.3.6. Removal of Pavement, Sidewalks, Curbs, Etc....63 5.3.7. Salvage....63 5.3.8. Abandoned Structures....64 5.3.9. Disposal of Abandoned Materials....64 5.4. WORKS ACCEPTANCE....64 5.4.1. Quality Control 65 5.4.2. Quality Assurance....65 5.5. MEASUREMENT AND PAYMENT....65 5.6. REFERENCES....66 SECTION 6. TEMPORARY STRUCTURES....67 6.1. GENERAL....67 6.1.1. Description....67 6.1.2. Working Drawings....67 vii Bridges Construction Specifications MOMRA 6.1.2.1. General 67 6.1.2.2. Submission Sets 67 6.1.2.3. Design Details 67 6.1.2.4. Foundation Loads....68 6.1.2.5. Materials Specifications 68 6.1.2.6. Concrete Placement....68 6.1.2.7. Settlements 68 6.1.2.8. Traffic....68 6.1.3. Requirements....68 6.2. FORMS AND FALSEWORK....69 6.2.1. Falsework Materials 69 6.2.1.1. General 69 6.2.1.2. Salvaged Steel 69 6.2.1.3. Timber 69 6.2.1.4. Used lumber 69 6.2.1.5. Manufactured components 69 6.2.2. Forms Materials....70 6.2.2.1. General 70 6.2.2.2. Sheathing....70 6.2.2.3. Structural Support 70 6.2.2.4. Prefabricated Formwork....70 6.2.2.5. Stay-in-Place Steel Deck Forms....70 6.2.2.6. Stay-in-Place Prestressed Concrete Deck Forms 71 6.2.3. Falsework Design and Construction....71 6.2.3.1. Design Loads....71 1. Vertical loads: 71 2. Horizontal loads 71 a. Wind Load 71 b. Stream flow....72 c. Lateral fluid pressure 72 d. Minimum Horizontal Load 73 3. Load Combinations....73 4. Slenderness 73 6.2.3.2. Allowable Design Stresses....73 1. Timber....74 2. Steel 74 3. Other requirements 75 4. Manufactured Assemblies....75 6.2.3.3. Foundation....75 6.2.3.4. Deflection....76 6.2.3.5. Clearance....76 6.2.3.6. Construction....76 1. Falsework Over or Adjacent to Roadways and Railroads 77 2. Falsework for Steel Structures....78 6.2.4. Formwork Design and Construction 78 6.2.4.1. General 78 6.2.4.2. Design 79 6.2.4.3. Construction 79 6.2.4.4. Tube Forms 79 6.2.4.5. Stay-in-Place Forms 80 6.2.5. Removal of Falsework and Forms....80 6.2.5.1. General 80 6.2.5.2. Time of Removal....81 6.2.5.3. Extent of Removal....81 viii MOMRA Bridges Construction Specifications 6.3. COFFERDAMS AND SHORING....82 6.3.1. General....82 6.3.2. Protection of Concrete 82 6.3.3. Removal 83 6.4. TEMPORARY WATER CONTROL SYSTEMS....83 6.4.1. General....83 6.4.2. Working drawings....83 6.4.3. Operation....83 6.5. TEMPORARY BRIDGES....83 6.5.1. General....83 6.5.2. Detour Bridges 83 6.5.3. Haul Bridges 84 6.5.4. Maintenance....84 6.6. WORKS ACCEPTANCE....84 6.6.1. Quality Control 84 6.6.2. Quality Assurance: 84 6.7. MEASUREMENT AND PAYMENT 85 6.8. REFERENCES....86 SECTION 7. PILING AND DRILLED SHAFTS CONSTRUCTION ..... 87 7.1. DESCRIPTION....87 7.2. SUBMITTALS 87 7.2.1. Contractor Qualifications and Equipment Adequacy 87 7.2.2. Working Drawings....88 7.3. MATERIALS 89 7.3.1. Driven Piles....89 7.3.1.1. Forms 89 7.3.1.2. Casting 89 7.3.1.3. Finish 89 7.3.1.4. Curing and Protection 89 7.3.1.5. Prestressing 89 7.3.1.6. Storage and Handling....89 7.3.2. Drilled Shafts 90 7.3.2.1. Concrete 90 7.3.2.2. Reinforcing Steel 90 7.3.2.3. Casings....90 7.3.2.4. Slurry 90 7.4. DRIVEN PILES CONSTRUCTION....92 7.4.1. Preparation for Driving 92 7.4.1.1. Site Work 92 1. Excavation 92 2. Pre-drilling to Facilitate Driving 92 3. Additional Requirements for Predrilled Holes in Embankments 92 7.4.1.2. Preparation of Piling 92 1. Pile Heads....92 2. Collars (metal hoops) 92 3. Pile Shoes and End Plates....93 ix Bridges Construction Specifications MOMRA 7.4.2. Pile Driving Equipment.... 93 7.4.2.1. Hammers 94 1. General....94 2. Drop Hammers....94 3. Air Hammers....94 4. Diesel Hammers....95 5. Hydraulic Hammers....95 6. Vibratory Hammers 95 7. Additional Equipment or Methods....95 7.4.2.2. Driving Appurtenances 95 1. Hammer Cushion 95 2. Helmet....96 3. Pile Cushion....96 4. Leads....96 5. Followers 96 6. Jetting....97 7.4.3. Driving 97 7.4.3.1. Heaved Piles....97 7.4.3.2. Obstructions 98 7.4.3.3. Installation Sequence....98 7.4.3.4. Limiting Driving Stresses....98 7.4.3.5. Driving of Probe Piles 98 7.4.3.6. Accuracy of Driving....98 7.4.4. Determination of Nominal Resistance 99 7.4.4.1. General 99 7.4.4.2. Static Load Tests 99 7.4.4.3. Dynamic Testing 100 7.4.4.4. Wave Equation Analysis 100 7.4.4.5. Dynamic Formula.... 100 7.4.5. Splicing of Piles 101 7.4.5.1. Concrete Piles.... 101 7.4.6. Defective Piles.... 101 7.4.7. Pile Cut-Off.... 101 7.5. DRILLED SHAFTS CONSTRUCTION.... 101 7.5.1. Protection of Existing Structures.... 101 7.5.2. Construction Sequence 102 7.5.3. Construction Methods 102 7.5.3.1. Trial Drilled Shafts.... 102 1. General.... 102 2. Location and Depth.... 102 3. Failure to Demonstrate Ability 102 4. Trial Shaft Approval 103 5. Site Restoration.... 103 7.5.3.2. Drilled Shafts 103 1. Hole Excavation.... 103 a. General.... 103 b. Dry Method.... 103 c. Wet Method 104 d. Casing Methods 104 d1. Temporary Casing Construction Method 104 d2. Permanent Casing Construction Method 104 d3. Double Casing Method 105 d4. Obstructions.... 105 2. Excavation Inspection.... 106 a. Inspection Equipment 106 x MOMRA Bridges Construction Specifications b. Removal of Excess Sediment and Water....106 c. Television Camera Inspection 106 c1. Equipment 106 c2. Drawings 106 c3. Shaft Inspection....106 3. Exterior Casing....107 4. Reinforcing Steel Cage Construction and Placement....107 a. General 107 b. Access Tubes for Crosshole Sonic Logging (CSL)....108 7.5.3.3. Concrete Placement, Curing and Protection 109 1. Tremies....110 2. Concrete Pumps....110 7.5.3.4. Concrete Sampling....110 7.5.3.5. Consistency....111 7.5.3.6. Defective Shafts....111 7.5.4. Alternative Construction Methods....111 7.5.5. Construction Tolerances 111 7.6. TESTING OF DRILLED SHAFTS....112 7.6.1. Test Shafts and Bells....112 7.6.2. Drilled Shaft Load Tests 112 7.6.3. Integrity Testing....113 7.6.4. Nondestructive Testing of Drilled Shafts....113 7.6.4.1. General....113 7.6.4.2. NDT Consultant....113 7.6.4.3. Testing Schedule....113 7.6.4.4. CSL Test Equipment....113 7.6.4.5. CSL Logging Procedures....114 7.6.4.6. CSL Testing Results ....114 7.6.4.7. Core Drilling of Drilled Shaft Concrete....114 7.6.4.8. Abandoning CSL Access Tubes ....115 7.7. WORKS ACCEPTANCE....115 7.7.1. Quality Control ....115 7.7.1.1. Driven Piles....115 7.7.1.2. Drilled Shafts....115 7.7.2. Quality Assurance....116 7.8. MEASUREMENT AND PAYMENT....116 7.8.1. Measurement....116 7.8.1.1. Driven Piles....116 1. Piles Furnished....116 2. Driven Piles 116 7.8.1.2. Pile Splices and Pile Shoes ....116 7.8.1.3. Drilled Shaft....116 7.8.1.4. Bell Footings....116 7.8.1.5. Test shafts 117 7.8.1.6. Test Bells 117 7.8.1.7. Exploration....117 7.8.1.8. Permanent Casing 117 7.8.1.9. Load Tests....117 7.8.2. Payment....117 7.8.2.1. Driven Piles....117 1. Unit Cost Contracts 117 2. Lump Sum Contracts....118 7.8.2.2. Drilled Shafts 119 1. Drilled Shaft 119 xi Bridges Construction Specifications MOMRA 2. Bell Footings.... 119 3. Test Shafts.... 119 4. Test Bells 120 5. Exploration Holes 120 6. Permanent Casing 120 7. Load Tests.... 120 7.9. REFERENCES 123 SECTION 8. GROUND ANCHORS....125 8.1. DESCRIPTION 125 8.1.1. Definitions.... 125 8.2. SUBMISSION AND DESIGN REQUIREMENTS 127 8.2.1. Contractor Qualifications 127 8.2.2. Working Drawings 127 8.3. MATERIALS.... 128 8.3.1. Prestressing Steel.... 128 8.3.2. Grout.... 128 8.3.3. Steel Elements 128 8.3.4. Corrosion Protection Elements.... 129 8.3.5. Miscellaneous Elements.... 129 8.4. CONSTRUCTION REQUIREMENTS.... 129 8.4.1. Tendons Fabrication.... 129 8.4.1.1. General 129 8.4.1.2. Tendon Bond Length.... 130 8.4.1.3. Spacers and Centralizers 130 8.4.1.4. Unbonded Length.... 130 8.4.1.5. Bearing Plates, Anchorage and Trumpet.... 131 8.4.1.6. Tendon Storage and Handling.... 131 8.5. INSTALLATION 132 8.5.1. Drilling 132 8.5.2. Tendon Insertion 132 8.5.3. Grouting 132 8.5.4. Trumpet and Anchorage.... 133 8.6. TESTING AND STRESSING 133 8.6.1. Verification Test.... 133 8.6.2. Test Equipment 133 8.6.3. Performance Test.... 134 8.6.4. Proof Test 135 8.6.5. Creep Test 136 8.6.6. Lock-Off.... 136 8.6.7. Acceptance 137 8.7. WORKS ACCEPTANCE.... 137 8.7.1. Quality Control.... 138 8.7.2. Quality Assurance 138 8.8. MEASUREMENT AND PAYMENT 138 8.9. REFERENCES 141 xii MOMRA Bridges Construction Specifications SECTION 9. EARTH RETAINING SYSTEMS.... 143 9.1. DESCRIPTION....143 9.2. WORKING DRAWINGS....143 9.3. MATERIALS 144 9.3.1. Concrete 144 9.3.1.1. Cast-in-Place 144 9.3.1.2. Pneumatically Applied Mortar....144 9.3.1.3. Precast Elements 144 9.3.1.4. Segmental Concrete Facing Blocks 144 9.3.2. Reinforcing Steel 144 9.3.3. Structural Steel....144 9.3.4. Structure Backfill Material....145 9.3.4.1. General....145 9.3.4.2. Crib and Cellular Walls 145 9.3.4.3. Mechanically Stabilized Earth Walls....145 9.4. EARTHWORK 146 9.4.1. Structural Excavation....146 9.4.2. Foundation Treatment....146 9.4.3. Structural Backfill....146 9.5. CONSTRUCTION....146 9.5.1. Cast-in-place Concrete Walls....147 9.5.1.1. Architectural Finish 147 9.5.1.2. Retaining Wall Placement....147 9.5.1.3. Vertical Precast Concrete Wall Elements with Cast-in-Place Concrete Footings . 147 9.5.2. Sheet Pile And Soldier Pile Walls....147 9.5.2.1. Sheet Pile Walls....147 9.5.2.2. Soldier Pile Walls 148 9.5.2.3. Anchored Sheet Piles and Soldier Pile Wall....149 1. General 149 2. Wales....149 3. Concrete Anchors System 149 4. Tie-rods....149 5. Ground Anchors 149 6. Earthwork 149 9.5.3. Crib Walls and Cellular Walls 150 9.5.3.1. Foundation 150 9.5.3.2. Crib Members 150 9.5.3.3. Concrete Monolithic Cell Members....150 9.5.3.4. Member Placement 150 9.5.3.5. Backfilling 151 9.5.4. Mechanically Stabilized Earth Walls 151 9.5.4.1. Facing....151 9.5.4.2. Soil Reinforcement 152 9.5.4.3. Construction....152 9.6. WORKS ACCEPTANCE....152 9.6.1. Quality Control 153 9.6.2. Quality Assurance....153 9.7. MEASUREMENT AND PAYMENT 153 9.8. REFERENCES....156 xiii Bridges Construction Specifications MOMRA SECTION 10. CONCRETE STRUCTURES....157 10.1. NOTATION 157 10.2. GENERAL 157 10.2.1. Description .... 157 10.2.2. Related Work.... 157 10.2.3. Construction Methods 157 10.3. CLASSES OF CONCRETE 157 10.3.1. General 157 10.3.2. Normal-Weight Concrete 158 10.3.3. Lightweight Concrete 158 10.4. MATERIALS.... 158 10.4.1. Cements 158 10.4.2. Aggregates.... 159 10.4.2.1. Fine aggregate 159 10.4.2.2. Coarse aggregate 159 10.4.2.3. Blended Aggregates 159 10.4.2.4. Lightweight aggregate 159 10.4.2.5. Exception.... 159 10.4.3. Admixtures 159 10.4.3.1. Mineral Admixtures 159 1. Pozzolans2F....160 2. Silica Fume 160 3. Slag 160 10.4.3.2. Chemical Admixtures.... 161 10.4.4. Water 162 10.5. PROPORTIONING OF CONCRETE 162 10.5.1. Mixing 162 10.5.1.1. Responsibility and Criteria.... 162 10.5.1.2. Trial Batch Test.... 163 1. Standard Deviation 163 2. Required Average Strength.... 164 10.5.1.3. Documentation of Average Strength.... 164 1. Average Strength Reduction 165 10.5.2. Water Content 166 10.5.3. Cement Content.... 166 10.5.4. Admixtures.... 167 10.5.4.1. Mineral Admixtures 167 10.5.4.2. Chemical Admixtures.... 167 10.6. MANUFACTURE OF CONCRETE 168 10.6.1. Storage of Cement.... 168 10.6.2. Storage of Aggregates 168 10.6.3. Measurements of Materials 168 10.6.4. Batching and Mixing of Concrete 169 10.6.4.1. Batching 169 10.6.4.2. Mixing.... 169 10.6.5. Delivery.... 169 10.6.6. Sampling and Testing.... 169 10.6.7. Evaluation and Acceptance of Concrete.... 170 10.6.7.1. Frequency of Testing.... 170 10.6.7.2. Laboratory-Cured Specimens.... 170 xiv MOMRA Bridges Construction Specifications 10.6.7.3. Field-Cured Specimens....171 10.6.7.4. Investigation of Low-Strength Test Results....171 10.6.7.5. Precast Concrete Cured By the Waterproof Cover Method, Steam, or Radiant Heat 172 10.7. PROTECTION OF CONCRETE FROM ENVIRONMENTAL CONDITIONS ....172 10.7.1. General....172 10.7.2. Rain Protection....172 10.7.3. Sulfate Exposures....172 10.7.4. Corrosion Protection of Reinforcement 173 10.7.5. Sulfate plus Chloride Exposures 174 10.7.6. Sabkha Exposures 174 10.7.7. Salt Weathering....174 10.7.8. Hot-Weather Protection 174 10.7.9. Special Requirements for Bridge Decks 175 10.8. CONCRETE PROTECTION FOR REINFORCEMENT....175 10.8.1. Cast-in-place concrete (non-prestressed) 175 10.8.2. Cast-in-place concrete (prestressed) 176 10.8.3. Precast concrete (manufactured under plant control conditions)....177 10.8.4. Bundled bars 177 10.8.5. Corrosive environments 178 10.8.6. Future extensions 178 10.8.7. Fire protection....178 10.9. HANDLING AND PLACING OF CONCRETE....178 10.9.1. General....178 10.9.2. Sequence of Placement 179 10.9.2.1. Vertical Members....179 10.9.2.2. Superstructures....179 10.9.2.3. Arches 179 10.9.2.4. Tunnels....179 10.9.2.5. Placing of Concrete for Tunnels on Rock Surfaces ....180 10.9.2.6. Box Culverts 180 10.9.2.7. Precast Elements....180 10.9.3. Placing Methods....180 10.9.3.1. General....180 10.9.3.2. Equipment....180 10.9.4. Consolidation 181 10.9.5. Underwater Placement....182 10.9.5.1. General....182 10.9.5.2. Equipment....182 10.9.5.3. Clean-up....182 10.10. CONSTRUCTION JOINTS....183 10.10.1. General....183 10.10.2. Horizontal Joints 183 10.10.3. Vertical Joints 183 10.10.4. Bonding....183 10.10.5. Bonding and Dowelling to Existing Structures....183 10.10.6. Forms at Construction Joints....184 10.11. EXPANSION AND CONTRACTION JOINTS....184 10.11.1. General....184 10.11.2. Materials 184 10.11.2.1. Premolded Expansion Joint Fillers 184 10.11.2.2. Polystyrene Board Fillers....184 xv Bridges Construction Specifications MOMRA 10.11.2.3. Contraction Joint Material.... 184 10.11.2.4. Pourable Joint Sealants (2).... 185 10.11.2.5. Metal Armor.... 185 10.11.2.6. Waterstops.... 185 1. Rubber Waterstops.... 185 2. Polyvinyl Chloride Waterstops 185 3. Copper Waterstops.... 186 4. Testing of Waterstop Material 186 10.11.3. Installation.... 186 10.11.3.1. Open Joints.... 186 10.11.3.2. Filled Joints 186 10.11.3.3. Sealed Joints.... 186 10.11.3.4. Waterstops.... 187 10.11.3.5. Expansion Joint Armor Assemblies 187 10.11.3.6. Sheet Packing, Preformed Pads and Board Fillers 187 10.12. FINISHING PLASTIC CONCRETE.... 187 10.12.1. General 187 10.12.2. Roadway Surface Finish.... 188 10.12.2.1. Striking Off and Floating 188 10.12.2.2. Straightedging 188 10.12.2.3. Texturing 188 1. Dragged.... 189 2. Broomed.... 189 3. Tined.... 189 10.12.2.4. Surface Testing and Correction.... 189 10.12.3. Pedestrian Walkway Surface Finish.... 189 10.12.4. Trowelled and Brushed Finish 190 10.12.5. Surface under Bearings 190 10.13. CURING CONCRETE 190 10.13.1. General 190 10.13.2. MATERIALS 191 10.13.2.1. Water 191 10.13.2.2. Liquid Membranes 191 10.13.2.3. Water Proof Sheet Materials 191 10.13.2.4. Methods.... 191 10.13.2.5. Forms-In-Place Method.... 191 10.13.2.6. Water Method.... 191 10.13.2.7. Liquid Membrane Curing Compound Method.... 191 10.13.2.8. Waterproof Cover Method 192 10.13.2.9. Steam or Radiant-Heat Curing Method.... 192 10.13.3. Bridge Decks 193 10.14. FINISHING FORMED CONCRETE SURFACES 193 10.14.1. General 193 10.14.2. Class 1 –Ordinary Surface Finish (2).... 193 10.14.3. Class 2 –Rubbed Finish.... 194 10.14.4. Class 3- Tooled Finish (2).... 194 10.14.5. Class 4- Sandblasted Finish.... 195 10.14.6. Class 5- Wire-Brushed or Scrubbed Finish.... 195 10.15. PRECAST CONCRETE MEMBERS 195 10.15.1. General 195 10.15.2. Working Drawings 195 10.15.3. Materials and Manufacture.... 195 10.15.4. Curing.... 196 xvi MOMRA Bridges Construction Specifications 10.15.4.1. Standard Curing Method....196 10.15.4.2. Steam Curing Method....196 10.15.5. Storage and Handling....196 10.15.6. Erection....197 10.15.7. Epoxy-Bonding Agents for Precast Segmental Box Girders ....197 10.15.7.1. Materials 197 1. Test 1-Sag Flow of Mixed Epoxy-Bonding Agent....198 2. Test 2-Gel Time of Mixed Epoxy-Bonding Agent....198 3. Test 3-Open Time of Bonding Agent....198 4. Test 4-Three-Point Tensile Bending Test....198 5. Test 5-Compression Strength of Cured Epoxy-Bonding Agent 199 6. Test 6-Temperature Deflection of Epoxy-Bonding Agent ....199 7. Test 7-Compression and Strength of Cured Epoxy-Bonding Agent .....199 10.15.7.2. Mixing and Installation of Epoxy 200 10.16. MORTAR AND GROUT 201 10.16.1. General....201 10.16.2. Materials and Mixing....201 10.16.3. Placing and Curing....201 10.17. APPLICATION OF LOADS 202 10.17.1. General....202 10.17.2. Earth Loads 202 10.17.3. Construction Loads 202 10.17.4. Traffic Loads....202 10.18. SPECIAL REQUIREMENTS FOR SEGMENTAL BRIDGES......202 10.18.1. Geometry Control 202 10.18.1.1. Deflection and Camber Data....202 10.18.1.2. Geometry Control 203 10.18.2. Tolerances....203 10.18.3. Shop Drawings and Design Calculations for Construction Procedures....205 10.18.3.1. General....205 10.18.3.2. Design Calculations for Construction Procedures 206 10.18.3.3. Shop Drawings....206 10.18.4. Forms 207 10.18.4.1. General....207 10.18.4.2. Forms for Precast Segmental Construction....207 10.18.5. Special Provision for Cast-In-Place Segmental Construction....208 10.18.5.1. General....208 10.18.5.2. Forming System....208 10.18.5.3. Superstructure Construction....209 10.18.6. Special Provision for Precast Concrete Segmental Construction....210 10.18.6.1. General....210 10.18.6.2. Fabrication 211 10.18.6.3. Separation of Match-Cast Segments 211 10.18.6.4. Handling and Erection of Segments 212 10.18.7. Special Provisions for Incremental Launching 212 10.18.7.1. General....212 10.18.7.2. Casting of Segments 212 10.18.7.3. Geometric Tolerances....212 10.18.7.4. Launching Force 212 10.18.7.5. Pier Monitoring....213 10.18.8. Defects and Breakage....213 10.19. CONCRETE FOR MINOR STRUCTURES....213 10.19.1. Description....213 xvii Bridges Construction Specifications MOMRA 10.19.2. Materials....213 10.19.3. Composition of Concrete for Minor Structure 213 10.19.4. Placing of Concrete 214 10.19.5. Curing of Concrete 215 10.19.6. Acceptance 215 10.20. WORKS ACCEPTANCE 215 10.20.1. Quality Control.... 215 10.20.2. Quality Assurance 215 10.21. MEASUREMENT AND PAYMENT 216 10.21.1. Measurement 216 10.21.2. Payment 216 10.22. REFERENCES 224 SECTION 11. REINFORCING STEEL....225 11.1. DESCRIPTION 225 11.1.1. General 225 11.2. MATERIALS.... 225 11.2.1. Coated Reinforcement 225 11.2.2. Uncoated Reinforcement 225 11.2.3. Stainless Steel Reinforcing Bars 226 11.2.4. Low Carbon, Chromium, Steel Reinforcing Bars 226 11.2.5. Bar Lists and Bending Diagrams.... 226 11.3. FABRICATION.... 226 11.3.1. Bending 226 11.3.2. Hooks and Bend Dimensions 226 11.3.3. Mill Test Reports.... 226 11.4. CONSTRUCTION METHODS.... 227 11.4.1. Handling, Storing and Surface Condition of Reinforcement 227 11.4.2. Placing and Fastening.... 227 11.4.2.1. General 227 11.4.2.2. Support Systems.... 227 11.4.2.3. Precast Concrete Blocks.... 228 11.4.2.4. Wire Bar Supports.... 228 11.4.2.5. Adjustments.... 228 11.4.2.6. Repair of Damaged Epoxy Coating.... 228 11.4.3. Splicing of Bars 228 11.4.3.1. General 228 11.4.3.2. Lap Splices 229 11.4.3.3. Welded Splices.... 229 11.4.3.4. Mechanical Splices.... 229 11.4.3.5. Splicing of Welded Wire Fabric.... 229 11.4.4. Substitutions 229 11.5. WORKS ACCEPTANCE.... 229 11.5.1. Quality Control.... 230 11.5.2. Quality Assurance 230 11.6. MEASUREMENT AND PAYMENT 230 11.6.1. Measurement 230 xviii MOMRA Bridges Construction Specifications 11.6.2. Payment....232 11.7. REFERENCES....234 SECTION 12. PRESTRESSING.... 235 12.1. GENERAL....235 12.1.1. Description....235 12.1.2. Definitions....235 12.1.3. Detail of Design 235 12.2. SUPPLEMENTARY DRAWINGS ....236 12.2.1. Working Drawings and Shop Drawings ....236 12.2.2. Integrated Drawings....237 12.3. SUBMITTALS ....237 12.4. MATERIALS ....238 12.4.1. Pre-stressing Reinforcement 238 12.4.1.1. Pre-stressing Steel and Anchorage....238 1. Strand....238 2. Wire....238 3. Bars....238 12.4.1.2. Post-Tensioning Anchorage and Couplers....238 1. Bonded System....238 2. Unbonded System....239 3. Special Anchorage Device Acceptance Test....239 a. Test Block Requirement....239 b. Test Block Dimensions ....240 c. Local Zone Reinforcement ....240 d. Skin Reinforcement....240 e. Concrete Strength ....240 f. Test Procedure....240 g. Cyclic Loading Test ....240 h. Sustained Loading Test ....240 i. Monotonic Loading Test ....241 j. Anchorage Zone Requirement....241 k. Test Series Requirement....241 1. Records of the Anchorage Device....241 12.4.2. Grout 242 12.4.2.1. Approval 242 12.4.2.2. Mixing....242 12.4.2.3. Grout Physical Properties ....242 12.4.3. Ducts 245 12.4.3.1. General....245 12.4.3.2. Metal Ducts....245 12.4.3.3. Plastic Ducts 245 12.4.3.4. Duct Area....246 12.4.3.5. Duct Fittings 246 12.5. CONSTRUCTION....246 12.5.1. General Tensioning Requirements....246 12.5.1.1. Concrete Strength....247 12.5.1.2. Pre-stressing Equipment 247 xix Bridges Construction Specifications MOMRA 12.5.1.3. Sequence of Stressing.... 247 12.5.1.4. Measurement of Stress 248 12.5.2. Pre-Tensioned Members.... 248 12.5.2.1. Pretensioning Requirements.... 248 12.5.2.2. Placement of Prestressing Steel.... 249 12.5.2.3. Releasing Steel 250 12.5.3. Post-Tensioned Members 250 12.5.3.1. Post-Tensioning Requirements 250 12.5.3.2. Placement of Ducts.... 251 1. General.... 251 2. Duct Inlets and Outlets.... 252 3. Proving of Post-Tensioning Ducts 252 4. Duct Pressure Field Test 252 12.5.3.3. Placement of Concrete 253 12.5.3.4. Placement of Post-Tensioning Steel.... 253 1. Protection of Steel after Installation 253 2. Protection of Tendon 254 12.5.3.5. Placement of Anchorage 254 12.5.3.6. Record of Stressing Operation 254 12.5.4. Identification and Testing.... 255 12.5.4.1. Pretensioning Tendons 255 12.5.4.2. Post-Tensioning Tendons.... 256 12.5.4.3. Anchorage Assemblies and Couplers.... 256 12.5.5. Protection of Pre-stressing Steel.... 256 12.5.6. Corrosion Inhibitor 256 12.5.7. Grouting 257 12.5.7.1. General 257 12.5.7.2. Preparation of Ducts.... 257 12.5.7.3. Equipment 258 12.5.7.4. Mixing of Grout 258 12.5.7.5. Injection of Grout 259 12.5.7.6. Temperature Considerations 259 12.5.7.7. Vertical Grouting.... 259 12.5.7.8. Post-Grouting Inspection.... 259 12.5.7.9. Finishing.... 260 12.5.7.10. Protection of End Anchorages.... 260 12.5.7.11. Construction Traffic and Operations Causing Vibrations 261 12.5.8. Tolerances 261 12.6. WORKS ACCEPTANCE.... 264 12.6.1. Quality Control.... 264 12.6.2. Quality Assurance 265 12.7. MEASUREMENT AND PAYMENT 265 12.7.1. Measurement 265 12.7.2. Payment.... 265 12.8. REFERENCES.... 267 SECTION 13. STEEL STRUCTURES....269 13.1. GENERAL 269 13.1.1. Description 269 xx MOMRA Bridges Construction Specifications 13.1.2. Notice of Beginning of Work....269 13.1.3. Inspection....269 13.1.4. Shipping, Handling and Storing Materials....270 13.1.5. Falsework....270 13.1.6. Continuous Members....270 13.2. DRAWINGS....271 13.2.1. General....271 13.2.2. Shop Drawings....271 13.2.3. Erection Drawings ....272 13.2.4. Camber Diagram....272 13.2.5. Transportation Drawings....272 13.3. MATERIALS ....272 13.3.1. Structural Steel....272 13.3.1.1. General....272 13.3.1.2. Carbon Steel....273 13.3.1.3. High-Strength, Low-Alloy Structural Steel ....273 13.3.1.4. High-Strength, Low-Alloy, Quenched, and Tempered Structural Steel Plate .....273 13.3.1.5. High-Yield-Strength, Quenched, and Tempered Alloy-Steel Plate .....273 13.3.1.6. Eye bars....273 13.3.1.7. Structural Tubing ....273 13.3.2. High-Strength Fasteners....273 13.3.2.1. General....273 13.3.2.2. Identifying Marks....274 13.3.2.3. Dimensions ....275 13.3.2.4. Galvanized High-Strength Fasteners ....275 13.3.2.5. Alternative Fasteners ....275 13.3.2.6. Load-Indicator Devices....276 13.3.3. Welded Stud Shear Connectors....276 13.3.3.1. General....276 13.3.3.2. Test Methods....276 13.3.3.3. Finish ....276 13.3.3.4. Certification ....277 13.3.3.5. Check Samples....277 13.3.4. Steel Forgings and Steel Shafting ....277 13.3.4.1. Steel Forgings ....277 13.3.4.2. Cold-Finished Carbon Steel Shafting ....277 13.3.5. Steel Castings....277 13.3.5.1. Mild Steel Castings ....277 13.3.5.2. Chromium Alloy-Steel Castings ....277 13.3.6. Iron Castings ....277 13.3.6.1. Materials ....277 13.3.6.2. Work Quality and Finish....278 13.3.6.3. Cleaning....278 13.3.7. Galvanizing....278 13.3.8. Storage of Materials ....278 13.4. FABRICATION....278 13.4.1. General....278 13.4.2. Quality of Workmanship....278 13.4.3. Identification of Steels during Fabrication....278 13.4.4. Plates....279 13.4.4.1. Direction of Rolling....279 13.4.4.2. Plate-Cut Edges....279 1. Edge Planning....279 xxi Bridges Construction Specifications MOMRA 2. Oxygen Cutting....279 3. Visual Inspection and Repair of Plate-Cut Edges.... 279 13.4.4.3. Bent Plates.... 279 1. General....279 2. Cold-Bending....279 3. Hot-Bending....280 13.4.5. Fit of Stiffeners....280 13.4.6. Abutting Joints 280 13.4.7. Facing of Bearing Surfaces 280 13.4.8. Straightening Material.... 281 13.4.9. Annealing and Stress Relieving 282 13.4.10. Bolt Holes.... 282 13.4.10.1. Holes for High-Strength Bolts and Unfinished Bolts.... 282 1. General....282 2. Punched Holes 283 3. Reamed or Drilled Holes 283 4. Accuracy of Holes 283 13.4.10.2. Accuracy of Hole Group 283 1. Before Reaming 283 2. After Reaming....283 3. Numerically-Controlled Drilled Field Connections.... 283 4. Holes for Ribbed Bolts, Turned Bolts, or Other Approved Bearing-Type Bolts 284 5. Preparation of Field Connections....284 13.4.11. Pins and Rollers....284 13.4.11.1. General 284 13.4.11.2. Boring Pin Holes 285 13.4.11.3. Threads for Bolts and Pins 285 13.4.12. Eyebars 285 13.4.13. Curved Girders 285 13.4.13.1. General 285 13.4.13.2. Heat-Curving Rolled Beams and Welded Girders 285 1. Materials 285 2. Camber....286 3. Measurement of Curvature and Camber 286 13.4.14. Orthotropic-Deck Superstructures....286 1. General....286 13.4.14.2. Flatness of Panels 286 13.4.14.3. Straightness of Longitudinal Stiffeners Subject To Calculated Compressive Stress, Including Orthotropic-Deck Ribs 287 13.4.14.4. Straightness of Transverse Web Stiffeners and Other Stiffeners Not Subject to Calculated Compressive Stress....287 13.4.15. Full-Size Tests....287 13.4.16. Marking and Shipping 287 13.5. ASSEMBLY 288 13.5.1. Bolting....288 13.5.2. Welded Connections 288 13.5.3. Preassembly of Field Connections 288 13.5.3.1. General 288 13.5.3.2. Bolted Connections 288 13.5.3.3. Check Assembly-Numerically-Controlled Drilling 288 13.5.3.4. Field-Welded Connections....289 13.5.4. Match-Marking....289 13.5.5. Connections Using Unfinished, Turned, or Ribbed Bolts 289 xxii MOMRA Bridges Construction Specifications 13.5.5.1. General....289 13.5.5.2. Turned Bolts 289 13.5.5.3. Ribbed Bolts 289 13.5.6. Connections Using High-Strength Bolts....290 13.5.6.1. General....290 13.5.6.2. Bolted Parts....290 13.5.6.3. Surface Conditions....290 13.5.6.4. Installation of Fastners....291 1. General 291 2. Rotational-Capacity Tests 293 3. Requirement for Washers 294 4. Turn-of Nut installation Method....295 5. Calibrated Wrench Installation Method ....295 6. Alternative Design Bolt Installation Method....296 7. Direct Tension Indicator Installation Method ....296 a. Verification....296 b. Installation....298 8. Lock-Pin and Collar Fasteners ....298 9. Inspection ....298 a. General ....298 b. Responsibilities of the Engineer....298 c. Inspection Procedures....298 13.5.7. Welding....299 13.6. ERECTION 299 13.6.1. General....299 13.6.2. Handling and Storing Materials ....299 13.6.3. Bearings and Anchorages....300 13.6.4. Erection Procedure....300 13.6.4.1. Conformance to Drawings ....300 13.6.4.2. Erection Stresses....300 13.6.4.3. Maintaining Alignment and Camber ....300 13.6.5. Field Assembly ....300 13.6.6. Pins Connections....301 13.6.7. Misfits ....301 13.7. EXPANSION JOINTS....301 13.8. WORKS ACCEPTANCE....301 13.8.1. Quality Control ....301 13.8.2. Quality Assurance....302 13.9. MEASUREMENT AND PAYMENT ....302 13.9.1. Method of Measurement....302 13.9.2. Basis of Payment....303 13.10. REFERENCES....307 SECTION 14. STEEL GRID FLOORING....309 14.1. GENERAL....309 14.1.1. Description....309 14.1.2. Working Drawings....309 14.2. MATERIALS ....309 xxiii Bridges Construction Specifications MOMRA 14.2.1. Steel....309 14.2.2. Protective Treatment 309 14.2.3. Concrete 309 14.2.4. Skid Resistance 310 14.3. ARRANGEMENT OF SECTIONS....310 14.4. PROVISION FOR CAMBER 310 14.5. FIELD ASSEMBLY....310 14.6. CONNECTION TO SUPPORTS....311 14.7. WELDING 311 14.8. REPAIRING DAMAGED GALVANIZED COATINGS....311 14.9. PLACEMENT OF CONCRETE FILLER 311 14.9.1. Forms....311 14.9.2. Placement 312 14.10. WORKS ACCEPTANCE 312 14.10.1. Quality Control.... 312 14.10.2. Quality Assurance 312 14.11. MEASUREMENT AND PAYMENT 313 14.12. REFERENCES 314 SECTION 15. PAINTING ......315 15.1. GENERAL 315 15.1.1. Description 315 15.1.2. Protection of Public and Property 315 15.1.3. Protection of the Work 315 15.1.4. Thickness and Color.... 316 15.2. PAINTING METAL STRUCTURES.... 316 15.2.1. Coating Systems and Paints 316 15.2.2. Weather Conditions.... 316 15.2.3. Surface Preparation 316 15.2.3.1. Blast Cleaning 317 15.2.3.2. Steam Cleaning 317 15.2.3.3. Solvent Cleaning 318 15.2.3.4. Hand Cleaning.... 318 15.2.3.5. Power Washing 318 15.2.4. Application of Paints 318 15.2.4.1. Application of Zinc-Rich Primers 319 15.2.5. Measurement and Payment 320 15.3. PAINTING GALVANIZED SURFACES.... 320 15.4. PAINTING TIMBER.... 320 15.4.1. General 320 15.4.2. Preparation of Surfaces 321 15.4.3. Paint.... 321 15.4.4. Application 321 15.4.5. Painting Treated Timber.... 321 15.4.6. Payment.... 321 xxiv MOMRA Bridges Construction Specifications 15.5. PAINTING CONCRETE 322 15.5.1. Surface Preparation....322 15.5.2. Paint 322 15.5.3. Application....322 15.6. WORKS ACCEPTANCE....322 15.6.1. Quality Control 322 15.6.2. Quality Assurance....323 15.7. MEASUREMENT AND PAYMENT 323 15.8. REFERENCES....325 SECTION 16. BEARING DEVICES....327 16.1. GENERAL....327 16.2. WORKING DRAWINGS....327 16.3. MATERIALS 328 16.3.1. General....328 16.3.1.1. Rolled Steel....328 16.3.1.2. Steel Laminates....328 16.3.1.3. Cast Steel 328 16.3.1.4. Forged Steel 328 16.3.1.5. Stainless Steel 328 16.3.2. Special Material Requirements for Electrometric bearings 328 16.3.2.1. Properties of the Elastomer....328 16.3.2.2. Fabric Reinforcement....331 16.3.2.3. Bond....331 16.3.3. Special Material Requirements for Pot and desk Bearing....331 16.3.3.1. Steel 331 16.3.3.2. Stainless Steel 331 16.3.3.3. Elastomeric Rotational Element For Pot Bearings 331 16.3.3.4. Sealant for Pot Bearings....331 16.3.3.5. Sealing Rings For Pot Bearings 332 16.3.3.6. Polytetrafluorethylene (PTFE) Sheet and Strip 332 16.3.3.7. Polyether Urethane Structural Element for Disc Bearings 332 16.3.4. Special Material Requirements for Rocker and Roller Bearings 332 16.3.5. Metal Plates Used in Masonry, Sole and Shim Plates 332 16.3.6. Special Material Requirements for PTFE Sliding Surfaces 333 16.3.6.1. PTFE Sheet and Strip....333 16.3.6.2. PTFE Resin 333 16.3.6.3. Filler Material 333 16.3.6.4. Adhesive Material....333 16.3.6.5. Unfilled PTFE Sheet 333 16.3.6.6. Filled PTFE Sheet....333 16.3.6.7. Fabric Containing PTFE Fibers 334 16.3.6.8. Lubricants 334 16.3.6.9. Interlocked Bronze and Filled PTFE Structures 334 16.3.6.10. Surface Treatment....334 16.3.6.11. Stainless Steel Mating Surface....334 16.3.7. Special Requirements for Anchor Bolts....334 16.3.8. Special Material Requirements for Bedding of Masonry Plates ....335 xxv Bridges Construction Specifications MOMRA 16.4. FABRICATION.... 335 16.5. TESTING AND ACCEPTANCE.... 336 16.5.1. General 336 16.5.1.1. Definitions.... 336 16.5.1.2. Test pieces to be supplied to the Engineer 336 16.5.1.3. Tapered Sole Plates 336 16.5.2. Tests 337 16.5.2.1. General 337 16.5.2.2. Material Certification Tests.... 337 16.5.2.3. Material Friction Test-Sliding Surfaces Only 337 16.5.2.4. Dimension Check 337 16.5.2.5. Clearance Test.... 338 16.5.2.6. Short-Term Compression Proof Load Test 338 16.5.2.7. Long-Term Compression Proof Load Test 338 16.5.2.8. Bearing Friction Test (for sliding surfaces only) 338 16.5.2.9. Long-Term Deterioration Test 339 16.5.2.10. Bearing Horizontal Force Capacity Fixed or Guided Bearings Only.... 339 16.5.3. Performance Criteria 339 16.5.4. Special Testing Requirements 339 16.5.4.1. Special Test Requirements for Elastomeric Bearings 339 1. General....339 2. Frequency of Testing 339 3. Ambient-Temperature Tests on the Elastomer 340 4. Low-Temperature Tests on the Elastomer 340 5. Visual Inspection of the Finished Bearing 340 6. Short-Duration Compression Test on Bearings 340 7. Long-Duration Compression Tests on Bearings 341 8. Shear Modulus Tests on Material from Bearings 341 16.5.4.2. Special Test Requirements for Pot and Disc Bearings 341 1. Lot Size 341 2. Sampling and Testing Requirements 341 a. Material Certification Tests 341 b. Testing by the Engineer 342 3. Performance Characteristics 343 a. Proof Load Test....343 b. Sliding Coefficient of Friction 343 16.5.4.3. Special Test Requirements for Rocker and Roller Bearing.... 343 16.5.4.4. Special Testing for Polytetrafluorethylene (PTFE) Surfaces for Bearings ..... 344 16.5.4.5. Special Testing Requirements for Bronze or Copper-Alloyed Plates for Bearings 344 16.5.4.6. Special Testing Requirements for Curved Sliding Bearing 344 16.5.5. Use of Tested Bearing in the Structure 345 16.6. PACKAGING, HANDLING, AND STORAGE 345 16.7. INSTALLATION 345 16.7.1. Elastomeric Bearings.... 346 16.7.1.1. General 346 16.7.1.2. Installation.... 346 16.7.2. Pot and Disc Bearings 346 16.7.2.1. General 346 16.7.2.2. Installation.... 346 16.7.3. Rocker And Roller Bearings 346 16.7.3.1. General 346 16.7.3.2. Installation.... 347 xxvi MOMRA Bridges Construction Specifications 16.7.4. Spherical Bearings ....347 16.7.4.1. General....347 16.7.4.2. Construction....347 16.7.4.3. Application....347 16.7.5. Bronze or Copper-Alloyed Plates for Bearings ....347 16.7.5.1. Bronze Bearing and Expansion Plates ....347 16.7.5.2. Rolled Copper-Alloy Bearings and Expansion Plates ....348 16.7.6. Masonry, Sole, and Shim Plates for Bearings....348 16.7.7. Polytetrafluorethylene (PTFE) Surfaces for Bearings ....348 16.7.7.1. General....348 16.7.7.2. Attachment of PTFE Material....349 1. Flat Sheet PTFE....349 2. Curved Sheet ....349 3. Fabric Containing PTFE Fibers....349 16.7.7.3. Stainless Steel Mating Surface....349 16.7.7.4. Lubrication....349 16.7.7.5. Installation ....350 16.7.8. Anchor Bolts ....350 16.7.9. Load Plates....350 16.7.10. Other Requirements for Guides ....350 16.7.11. Installation for Guide-ways and Restraints ....350 16.8. MEASUREMENT AND PAYMENT ....351 16.8.1. Measurement....351 16.8.2. Payment....351 16.9. REFERENCES....353 SECTION 17. BRIDGE DECK JOINT SEALS....355 17.1. GENERAL....355 17.2. WORKING DRAWINGS....355 17.3. MATERIALS ....355 17.4. MANUFACTURE AND FABRICATION....356 17.4.1. Compression Seal Joints ....356 17.4.2. Joint Seal Assemblies ....356 17.5. INSTALLATION....356 17.5.1. General....356 17.5.2. Compression Seal Joints ....356 17.5.3. Joint Seal Assemblies....357 17.6. WORKS ACCEPTANCE....357 17.6.1. Quality Control ....357 17.6.2. Quality Assurance....357 17.7. MEASUREMENT AND PAYMENT....357 17.8. REFERENCES....358 xxvii Bridges Construction Specifications MOMRA SECTION 18. RAILINGS....359 18.1. GENERAL 359 18.2. MATERIALS AND CONSTRUCTION REQUIREMENTS.... 359 18.2.1. Steel Railing 359 18.2.1.1. W-Beam or Thrie-Beam Railing 359 18.2.1.2. Wire Rope Railing.... 359 18.2.1.3. Pipe Railing.... 360 1. Galvanized Steel Pipe and Fittings 360 2. Black Steel Pipe and Fittings 360 18.2.1.4. Welding 360 18.2.1.5. Finish.... 361 18.2.1.6. Installation.... 361 18.2.2. Aluminum Railing 361 18.2.3. Metal beam railing 361 18.2.4. Concrete Railings 362 18.2.5. Temporary Railing 362 18.2.6. Railings Accessories and Reinstallation of Railings 362 18.3. WORKS ACCEPTANCE 363 18.3.1. Quality Control....363 18.3.2. Quality Assurance 363 18.4. MEASUREMENT AND PAYMENT 364 18.4.1. Measurement 364 18.4.2. Payment 364 18.5. REFERENCES 367 SECTION 19. WATERPROOFING....369 19.1. GENERAL 369 19.1.1. Waterproofing 369 19.1.2. Dampproofing 369 19.2. MATERIALS....369 19.2.1. Asphalt Membrane Waterproofing Materials.... 369 19.2.1.1. Asphalt 369 19.2.1.2. Primer 369 19.2.1.3. Fabric....369 19.2.2. Preformed Membrane Waterproofing Systems 369 19.2.2.1. Primer 369 19.2.2.2. Preformed Membrane Sheet....370 19.2.2.3. Mastic....371 19.2.3. Waterproofing Admixtures in Concrete 371 19.2.4. Miscellaneous Materials....371 19.2.5. Protective Covers 371 19.2.5.1. Portland Cement Mortar....371 1. Cement....372 2. Fine aggregate....372 3. Lime 372 4. Water....372 xxviii MOMRA Bridges Construction Specifications 19.2.6. Dampproofing....372 19.2.7. Inspection and Delivery 372 19.3. CONSTRUCTION REQUIREMENTS ....372 19.3.1. General 372 19.3.2. Storage of Fabric 373 19.3.3. Preparation of Surface....373 19.3.4. Application of Waterproofing and Dampproofing....373 19.3.4.1. Asphalt Membrane Waterproofing 373 1. Installation 373 2. Special Details 374 3. Damage Patching....374 19.3.4.2. Preformed Membrane Waterproofing Systems....374 1. Installation on Bridge Decks 375 2. Installation on Other Surfaces 376 19.3.4.3. Dampproofing....376 19.3.5. Protective Covers....376 19.4. WORKS ACCEPTANCE....376 19.4.1. Quality Control 377 19.4.2. Quality Assurance....377 19.5. MEASUREMENT AND PAYMENT 377 19.5.1. Measurement....377 19.5.2. Payment....377 19.6. REFERENCES....379 SECTION 20. DRAINAGE SYSTEMS ....381 20.1. DESCRIPTION....381 20.1.1. Definitions....381 20.2. MATERIALS ....381 20.2.1. Materials Related to Superstructure....381 20.2.1.1. Gully and Channel Grates and Frames ....381 20.2.1.2. Fiberglass Pipe....381 20.2.1.3. PVC and U-PVC Pipes ....382 20.2.1.4. Aluminum Pipes ....382 20.2.1.5. Steel Alloy Pipe for Bridge Storm Drains ....382 20.2.1.6. Zinc Coating on Steel....382 20.2.1.7. Castings, Materials and Components for Drainage Structures ....382 20.2.2. Materials Related to Retaining Systems ....383 20.2.2.1. Pipe and Perforated Pipe....383 20.2.2.2. Filter fabric ....383 20.2.2.3. Permeable Material ....383 20.2.2.4. Geocomposite Drainage Systems ....383 20.3. CONSTRUCTION REQUIREMENTS ....383 20.3.1. Inlet Frames, Grates, and Scuppers....383 20.3.2. Steel Alloy Pipe ....383 20.3.3. Fiberglass Pipe and Fittings ....383 20.3.4. Concrete Gutters ....384 20.3.5. Weep Holes....384 20.3.6. Drainage Blankets....384 xxix Bridges Construction Specifications MOMRA 20.3.7. Geocomposite Drainage Systems 385 20.4. WORKS ACCEPTANCE 385 20.4.1. Quality Control.... 385 20.4.2. Quality Assurance 385 20.5. MEASUREMENT AND PAYMENT 385 20.5.1. Measurement 385 20.5.1.1. Gully Grates and Frames.... 385 20.5.1.2. Bridge Deck Drainage Pipes 385 20.5.1.3. Subsidiary Work.... 386 20.5.2. Payment 386 20.6. REFERENCES 388 SECTION 21. SLOPE PROTECTION ....389 21.1. GENERAL 389 21.1.1. Description 389 21.1.2. Types 389 21.1.2.1. Riprap....389 21.1.2.2. Concrete Slope Paving 389 21.1.2.3. Precast Concrete Slope Paving....389 21.2. WORKING DRAWINGS....389 21.3. MATERIALS....390 21.3.1. Stone materials 390 21.3.2. Wire-Enclosed Riprap (Gabions) 391 21.3.3. Filter Fabric 391 21.3.4. Grout....391 21.3.5. Sacked Concrete Riprap 391 21.3.6. Portland Cement Concrete....391 21.3.7. Expansion Joint filler....391 21.3.8. Pneumatically Applied Mortar 391 21.3.9. Precast Portland Cement Concrete Blocks and Shapes 392 21.3.10. Reinforcing Steel....392 21.3.11. Geocomposite Drain....392 21.4. CONSTRUCTION 392 21.4.1. Preparation of Slopes....392 21.4.2. Bedding 392 21.4.3. Filter Fabric 392 21.4.4. Geocomposite Drain....393 21.4.5. Hand-Placing Stones 393 21.4.6. Machine-Placed Stones 393 21.4.6.1. Dry Placement 393 21.4.6.2. Underwater Placement 393 21.4.7. Wire-Enclosed Riprap (Gabions) 394 21.4.7.1. Fabrication.... 394 21.4.7.2. Installation.... 394 21.4.8. Grouted Riprap.... 395 21.4.9. Sacked Concrete Riprap 395 21.4.10. Concrete Slope Paving 396 21.4.10.1. General 396 xxx MOMRA Bridges Construction Specifications 21.4.10.2. Cast-in-Place Slope Paving....396 21.4.10.3. Precast Slope Paving....397 21.5. WORKS ACCEPTANCE....397 21.5.1. Quality Control ....397 21.5.2. Quality Assurance....397 21.6. MEASUREMENT AND PAYMENT....397 21.6.1. Measurement....397 21.6.1.1. Stone Riprap and Filter Blanket....397 21.6.1.2. Sacked Concrete Riprap....398 21.6.1.3. Wire-Enclosed Riprap (Gabions)....398 21.6.1.4. Cast-in-Place Concrete Slope Paving ....398 21.6.1.5. Precast Concrete Slope Paving ....398 21.6.1.6. Filter Fabric....398 21.6.2. Payment....398 21.6.2.1. General....398 21.6.2.2. Stone Riprap ....398 21.6.2.3. Sacked Concrete Riprap....399 21.6.2.4. Wire-Enclosed Riprap (Gabions)....399 21.6.2.5. Cast-in-Place Concrete Slope Paving ....399 21.6.2.6. Precast Concrete Slope Paving ....399 21.6.2.7. Filter Blanket ....399 21.6.2.8. Filter Fabric....399 21.6.2.9. Geocomposite Drain System....399 21.7. REFERENCES....402 SECTION 22. MISCELLANEOUS METAL .... 403 22.1. DESCRIPTION....403 22.2. MISCELLANEOUS IRON AND STEEL....403 22.3. MISCELLANEOUS BRIDGE METAL ....405 22.4. BRIDGE JOINT RESTRAINER UNITS ....408 22.5. PUMPING PLANT METAL WORK ....410 22.6. FABRICATION....410 22.7. GALVANIZING....411 22.8. MEASUREMENT AND PAYMENT....411 22.8.1. Measurement....411 22.8.2. Payment....411 22.9. REFERENCES....413 SECTION 23. PNEUMATICALLY APPLIED MORTAR (SHOTCRETE) 415 23.1. GENERAL 415 xxxì Bridges Construction Specifications MOMRA 23.1.1. Description 415 23.1.2. Definitions.... 415 23.2. CONTRACTOR QUALIFICATIONS.... 415 23.2.1. General 415 23.2.1.1. Foreman....416 23.2.1.2. Nozzle Operator 416 23.2.1.3. Finisher or Rodman....416 23.2.1.4. Gun or Pump Operator 416 23.3. MATERIALS.... 416 23.3.1. Cement (ACI 506R) 416 23.3.2. Aggregate 416 23.3.2.1. Normalweight Aggregate 416 23.3.2.2. Lightweight Aggregates 416 23.3.2.3. Recovered Rebound 417 23.3.3. Water 417 23.3.3.1. Mixing Water 417 23.3.3.2. Curing Water 417 23.3.4. Other Materials.... 417 23.3.5. Admixtures 417 23.3.6. Reinforcement 417 23.3.6.1. Reinforcing Bars 417 23.3.6.2. Wire Reinforcement 418 23.3.6.3. Epoxy-Coated Reinforcement 418 23.3.6.4. Fiber-Reinforced Shotcrete 418 23.3.6.5. Prestressing Steel.... 418 23.3.6.6. Other Forms of Steel 418 23.4. SHOTCRETING PROCESSES.... 419 23.4.1. Dry-Mix Process 419 23.4.2. Wet-Mix Process 419 23.4.3. Comparison of the Processes.... 419 23.5. PRELIMINARY PROCEDURES 420 23.5.1. General 420 23.5.2. Surface Preparation 420 23.5.2.1. Steel Surfaces 420 23.5.2.2. Concrete Surfaces.... 420 23.5.2.3. Masonry Surfaces 421 23.5.2.4. Rock Surfaces.... 421 23.5.2.5. Earth Surfaces 421 23.5.2.6. Wood Forms.... 422 23.5.3. Anchors 422 23.5.3.1. Anchoring to Steel.... 422 23.5.3.2. Anchoring to Concrete, Masonry, or Rock 422 23.5.3.3. Anchoring to Wood 423 23.5.4. Protection of Adjacent Surfaces 423 23.6. PROPORTIONING AND PRECONSTRUCTION TESTING ...... 424 23.6.1. Proportioning of Shotcrete Mixture 424 23.6.2. General 424 23.6.2.1. Wet-Mix Process 424 23.6.2.2. Dry-Mix Process 424 1. Aggregate Proportion....424 2. Mixture Proportions....425 23.6.3. Preconstruction Testing....425 xxxii MOMRA Bridges Construction Specifications 23.6.3.1. Field trials 425 23.6.3.2. Coring 426 23.6.3.3. Testing of Cores....426 23.6.3.4. Mix Design Acceptance 426 23.7. PLACEMENT OF PNEUMATICALLY APPLIED MORTAR 426 23.7.1. Placement of Reinforcement....426 23.7.2. Placement of Mortar 427 23.7.3. Finishing 428 23.7.4. Weather Limitations....428 23.7.4.1. Hot-Weather Shotcreting 428 23.7.4.2. Cold-Weather Shotcreting 429 23.8. CURING AND PROTECTING....429 23.9. QUALITY CONTROL....429 23.9.1. Materials 429 23.9.2. Placement Techniques....430 23.9.3. Inspection....430 23.9.4. Testing Procedures....430 23.10. MEASUREMENT AND PAYMENT 430 23.10.1. Measurement....430 23.10.2. Payment....431 23.11. REFERENCES....433 SECTION 24. TUNNEL CONSTRUCTION......435 24.1. SCOPE 435 24.1.1. Description....435 24.1.2. Definitions....435 24.2. REFERENCE STANDARDS....436 24.2.1. Standards....436 24.3. SUBMISSIONS 436 24.3.1. Methods of Construction....436 24.3.2. Design Calculations ....437 24.4. GENERAL REQUIREMENTS 437 24.4.1. General....437 24.4.2. Safety General....437 24.4.3. Compressed Air Working 439 24.4.4. Explosives 439 24.4.5. Water....440 24.4.6. Ventilation....440 24.4.6.1. Method of Ventilation....441 24.4.6.2. Testing of Air....441 24.4.7. Control of Dust 442 24.5. EXCAVATION 442 24.5.1. General....442 24.5.2. Passing Bays 443 24.5.3. Temporary Shafts, Adits or Tunnels for Access 443 24.5.4. Disposal of Excavated Material 444 xxxiii Bridges Construction Specifications MOMRA 24.5.5. Excavation for Bolted Ring Tunnels in Soft Ground 444 24.5.6. Excavation through Weak Weathered Rock 444 24.5.7. Excavation through Generally Prevailing Rock 445 24.5.8. Shaft and Tunnel Excavation Records in Rock 446 24.5.9. Shaft and Tunnel Excavation Records in Soft Ground 447 24.6. SUPPORTS 447 24.6.1. Bolted Concrete Rings.... 447 24.6.1.1. Erection of Bolted Ring.... 448 24.6.2. Steel Supports.... 448 24.6.2.1. Materials for Steel Supports 449 24.6.2.2. Installation of Steel Supports and Lagging 449 24.6.3. Rock Bolting 451 24.6.3.1. General 451 24.6.3.2. Materials.... 452 1. Steel for Rock Bolts and Dowels 452 2. Types of Rock Bolts and Dowels.... 452 3. Cement Grouts for Rock Bolts and Dowels.... 453 4. Resin Grouts for Rock Bolts and Dowels 453 24.6.3.3. Installation.... 454 24.6.3.4. Ungrouted Installation.... 455 24.6.3.5. Resin Grouted Bolts 456 24.6.3.6. Cement Grouted Rock Bolts 456 24.6.3.7. Steel Dowels.... 456 24.6.3.8. Spacing Rock Bolts 456 24.6.3.9. Testing of Rock Bolts.... 457 1. Standard Pull-Out Tests 457 2. Tensile Tests 457 24.6.4. Shotcrete Support 457 24.7. GROUTING WORKS 459 24.7.1. General 459 24.7.2. Equipment for Cavity Grouting.... 459 24.7.3. Equipment for Fissure Grouting.... 460 24.7.4. Materials for Cement Grout 460 24.7.4.1. Cement 460 24.7.4.2. Bentonite 460 24.7.4.3. Water 460 24.7.4.4. Filler 461 24.7.5. Cavity Grouting of Precast Concrete Tunnel Linings 461 24.7.6. Secondary Grouting of Tunnel Rings.... 461 24.7.7. Contact Grouting 462 24.7.8. Fissure Grouting Procedure.... 463 24.7.8.1. Equipment for Chemical Grouting....464 24.7.9. Procedure of Chemical Grouting....464 24.7.10. Documentation 464 24.8. IN SITU CONCRETE LINING 465 24.8.1. Preparation for Concrete Lining.... 465 24.8.2. Placing Concrete 465 24.8.3. Concrete in Tunnel Inverts 465 24.8.4. Formwork to Tunnel and Shaft Lining.... 465 24.8.4.1. Construction Joints.... 466 24.8.5. Filling Over-break 466 24.8.6. Drilling and Grouting 466 24.9. THE METAL LINING 466 xxxiv MOMRA Bridges Construction Specifications 24.9.1. General 466 24.9.2. Internal protection....467 24.9.3. Outside protection....467 24.9.4. Shipping and packaging and storage....467 24.9.5. Exposure 467 24.9.6. The Situation....467 24.9.7. Welded Joints....468 24.9.8. Examination of welded joints 468 24.9.9. Injection Arrangements....468 24.10. MAJOR TUNNELING EQUIPMENT AND THEIR SPECIFIC USES ......468 24.10. …(1,398,984 more chars)